Project Overview

Location

Cyrpus

Value

Undisclosed

Services provided

Feasibility study, due diligence, pre-construction support.

What We Did

International Project / Renewable energy project / Feasibility & technical review

A Technically Advanced Anaerobic Digestion Facility In Cyprus

PWCL carried out a full feasibility study and are now supporting the pre-construction phase of a technically complex Anaerobic Digestion facility in Cyprus, ensuring process-driven requirements are integrated into design and planning.

Project Background

Paul Winter Consulting Ltd. (PWCL) was commissioned to assess the feasibility of developing an Anaerobic Digestion (AD) facility in Cyprus.

The study explored the viability of the project across a range of key variables, with PWCL producing a detailed report to support client decision-making and next steps.


What we did

Following the feasibility study, PWCL has continued its involvement into the pre-construction phase. This stage requires close coordination between the process design team, civil and structural engineers, and M&E specialists.

PWCL’s role ensures that process-driven requirements are effectively integrated into the site planning, equipment layout, and building enclosures.

By aligning technical design with operational needs, PWCL is helping ensure the feasibility and integrity of the facility from the earliest stages — laying the groundwork for a successful construction and commissioning process.